St Peter’s, North Tawton DHCT Case Study
Where: St Peter’s, North Tawton
Location: Google Maps
The Works: Reordering of the West End
DHCT Grant Awarded: £4,500
Total Project Fund: £448,600
Date of DHCT Grant Award: January 2025
Project Start: January 2026
Project End: October 2026
Overview
St Peter’s is a Grade 1 listed church, situated in the heart
of the town of North Tawton. The West
End of the church has been redeveloped on several occasions, most notably in
Victorian times and in the 1980s. The
current facilities were cramped and dark and unsuitable for the current use of
the church.
The Grant Application & Project
The West End reordering project sought to provide modern facilities including a larger kitchen and accessible toilets; create a new accessible main entrance to the building; increase the meeting room space in the West End including breakout spaces for three children’s and youth groups during Sunday services; and replace a dangerous metal spiral staircase. Importantly, the completed works were to be more sympathetic to the historical fabric of the building than the previous redevelopments.
The works were funded through existing church funds,
congregational giving and through various grants totalling (£119,000). At the time of applying for the grant of the
project the estimated cost for the project was £385,000 which increased through
the lifetime of the project through the discovery of new archaeology, improved
fire protection and the increases in material/labour costs.
One piece of archaeology we discovered was medieval flooring which had been buried beneath the 1980s concrete floor. As part of the project this was lifted and now forms part of the flooring in the tower room.
North Tawton PCC were grateful to Devon Historic Churches Trust for their generous grant towards this project which enabled us to enhance this beloved building while preserving its history.